This apartment had different floors in each premise. It includes a wooden floor and marble tiles. Our team has a dedicated unit in tiles, and we did both tasks at once. The installation consists of a smooth transition between the different surfaces with perfect leveling and no difference between the rooms.
The whole job took about 2.5 days because we prepared everything required to make the job done as soon as possible. Usually, it takes more time, but we organized the whole process from the very beginning.
Right now, the apartment has perfectly installed marble tiles and solid wood floorboards. There is no doubt, the homeowners will enjoy their new floor for a very long time (about 8-12 years).