The home decor season is open, and we had to make full floor restoration with sanding and lots of repairs. As you can see, we had to remove the previous finish with sanding machinery 3 times. The repairs were more gap filling and some deeper scratches. In the end, we had to achieve the previous floor colour, but without all the issues. It was a small room, but these small issues took more time than expected. The job took 9 hours.
This hallway had a crying need for a new floor, and we did fitting of engineered wood as it one of the best solutions for such a premise. Of course,...







