The floor sanding of this property required a lot of work, and we had to recover the entire flooring. We did the sanding, gap filling with resin and sawdust, floorboard replacement, and subfloor repair. It was really a lot of work, but we did the necessary to achieve the best results.
The job took 16 hours.