This project required a lot of work. It looks nice before the job, but actually, the whole floor was full of damages, scratches, bubbles, and gaps between the floorboards.
It was an entire restoration with sanding and gap filling. We did all the necessary things to achieve maximum results. The final touch was sealing with a more durable mixture.
The job took almost 2 days because it had to look more than exceptional.