Hallway repair and gap filling - house, Croydon

before and after hallway repair and gap filling in a house, Croydon

For every homeowner, the hallway flooring is a big challenge. During the rainy days and the winter season, the hallway has many issues with the wet shoes and small particles from the street. All this is causing a lot of damages, and the upper surface requires regular improvement. This time, it was only repaired and gap-filling because we had to seal the surface.

The job took 7 hours.

More Sanding Galleries
The floor restoration of the second building of this school was finished. This time the floor restoration required more time than expected. The...
The white staining is part of a specific finishing. We had to change the entire house's view, and this room was not a challenge for our team. We've...
Changing the colour of the stairs is something very difficult. We had to remove the previous colour carefully from every floorboard, angle, and...
This site had a specific need. It was required to change the flooring colour with a white-grey combination. We had to remove the previous finishing,...
Many times the pine floorboards have problems with small gaps between them. It was necessary to fill all of them during the sanding and then to apply...
The flooring renovation was very easy at this premise. We did the required sanding, and then the finishing with white colour. The polishing was a...