Old flooring removal and new floorboards fitting - Haringey

before and after Old flooring removal, installation of new floorboards, skirting and strips, Haringey

Installation of a new flooring always requires removing the previous (old) floorboards. It's a gentle process that requires to keep perfection in removing all nails and keep the subfloor in good condition. The new floorboards fitting requires perfect laying and correct placing of the skirtings and all the strips. At the very end, we did staining and finishing to improve the flooring quality (health).

The job took 15 hours.

More Sanding Galleries
We cut all the doors, put a finishing element on the stairs, and put strips after engineered floor installation on stairs and 2nd floor in house.
Floor sanding always requires special attention to every detail. The process in this apartment needed some small repairs, gap filling, and finishing...
Light sanding 15m2 and finish with Loba clear matt lacquer in room. Light sanding is a great solution to protect your property floors from the bigger...
Engineered wood glue down installation in the groove and feather. Applied noise insulation to floor. It's done in a small house in Muswell Hill, on...
The hallway is very often a place with severely damaged floorboards. This house was not an exception. We had to repair lots of small issues, and then...
The Before and After pictures show you exactly what was done. We had to change the flooring colour using a dust-free methodology. The bedroom is...