The flooring restoration in this house required a lot of attention. We had to remove the previous staining and fix all the problems between the floorboards. It took more than expected because the subfloor area was in terrible condition.
The restoration included full sanding, gap filling, reclaiming, staining, and finishing with matt lacquer Deva.
The job took a day and 3 hours.