New flooring buffing and polish - house, Lambeth

before and after new floor polishing, Lambeth

Polishing is the very last flooring service, and we had to polish the newly installed finished floorboards. The idea was to be sure that every aspect of the floor is perfectly fitted. There is nothing special during the polishing. The job took 9 hours.

More Sanding Galleries
The stairs of this house have a long history, and its current floor had to be changed. The best solution, in this case, was a solid wood floor...
This house has a beautiful wood floor, which required light restoration with sanding and staining. After the renovation, we did finishing with matt...
We did the perfect floor laying with finished solid wood in cozy colour. The installation was made with a glue-down method and brilliant fitting...
Sanding and finishing with Bona natural (preserves the natural color of the tree).
This apartment had different floors in each premise. It includes a wooden floor and marble tiles. Our team has a dedicated unit in tiles, and we did...
This small house in the heart of Larkhall has a very good floor. However, the time for home improvement has come, and it was necessary to make the...