Replacement of bearing beams and new installation - hallway, Chelsea

before and after Replacement of bearing beams, Chelsea

When installing new floors, it's highly important to take care of the subfloor condition and every that has to be replaced. We did the necessary fixations and then installed the new floorboards to achieve maximum effect.

The job took 2 days.

More Sanding Galleries
This luxury apartment requires a lot of precise work and attention to details. It was necessary to apply a specific colour, and keep the wood effect...
Hardwood floor sanding of high-quality wood with no need of finishing. This place has its own style, and to keep it modern the owner prefer a raw...
This project required a lot of work. It looks nice before the job, but actually, the whole floor was full of damages, scratches, bubbles, and gaps...
This floor restoration was part of a more significant renovation. We had to do a light sanding in the bedroom and recover the maple floorboards'...
That's a complete sanding service for a cozy apartment in the heart of Kensington. We did everything required to make this guest room like new. As...
This modern apartment has small damages and scratches on the floor. It was necessary to make a light sanding with mat color finishing to keep it...