We did the perfect floor laying with finished solid wood in cozy colour. The installation was made with a glue-down method and brilliant fitting. Before we started with the installation, the sub-floor had to be perfectly flat. We made the required leveling and all other necessary repairs.
Upon installation, the solid wood floor was cleaned and ready for use. The whole process took 2 days.