This small office had an emergency before an important meeting. The entire floor was in very bad condition and it has to be renovated within 24 hours. It required a lot of hard work in short period of time. However, we made everything on time. The finishing was made with quickly drying up varnishing. No staining was needed, but a lot of replacement and nailing was made.
The kids' room is intended to be the place on the property. We had to turn back the flooring in its best version and to seal the surface with eco-...







