Solid wood dustless restoration - kitchen, Canary Wharf

Solid wood dustless restoration - kitchen, Canary Wharf

This fantastic floor required perfect sub-floor preparation, best laying, and outstanding fitting. After that, the staining brought a good looking surface, and the refinishing made the final effect. Such an installation takes about 2-3 days, depending on the size of the room. In this case, it's two days and a half. In this case, the polishing is always recommended because it makes the floor shining and not so slippy.

More Sanding Galleries
This bedroom had a crying need for floor restoration. A lot of things had to be done during the sanding process, including reclaiming with the right...
Staircases sanding, replacement of broken floorboards, polishing, staining, two coats clear oil.
Tower Hamlets-Bow, full restoration of the pine wooden floor, we fixed all the boards, repaired the boards that were broken, sanded the ground with...
You can say 'Magic is real' when you see the final result. This solid wood floor was in good condition, but it was necessary to make a lot of small...
Perfect floor sanding comes with the best attention to every detail. There is no rush to achieve maximum effect, but also there is no delay with our...
The bamboo floors are a bit different. They require a different sanding method to keep the wood in excellent condition. Also, refinishing is very...