Old flooring removal and new floorboards fitting - Haringey

before and after Old flooring removal, installation of new floorboards, skirting and strips, Haringey

Installation of a new flooring always requires removing the previous (old) floorboards. It's a gentle process that requires to keep perfection in removing all nails and keep the subfloor in good condition. The new floorboards fitting requires perfect laying and correct placing of the skirtings and all the strips. At the very end, we did staining and finishing to improve the flooring quality (health).

The job took 15 hours.

More Sanding Galleries
The flooring in the house is oak solid wood floorboards. We had to make complete sanding and small repairs around the walls. The process included...
Stairs restoration is not complex, but this one was a challenge. The previous condition was absolutely terrible, and we had to do lots of sanding and...
Another hallway in London, another need of sanding. This time, it was a bit harder to achieve the maximum effect due to many errors on the surface...
We set 20 mm. acoustic insulation before installing engineered wooden floor.
This is just another hallway with a serious flooring problem in the hallway. We had to make dust-free sanding and recover its original colour and...
We cut all the doors, put a finishing element on the stairs, and put strips after engineered floor installation on stairs and 2nd floor in house.