Replacement of bearing beams and new installation - hallway, Chelsea

before and after Replacement of bearing beams, Chelsea

When installing new floors, it's highly important to take care of the subfloor condition and every that has to be replaced. We did the necessary fixations and then installed the new floorboards to achieve maximum effect.

The job took 2 days.

More Sanding Galleries
We did a full floor repair of a small apartment in Kensington and Chelsea. We did a precise gap filling to seal the floor and sanding plus...
This big apartment requires an installation of engineered wood with perfect surface. The process includes perfect sub-floor preparation, leveling,...
Kids' rooms are always messy, and usually, the flooring needs some repairs. We did the entire repair by making a gap-filling and light sanding. After...
This house in Kensington & Chelsea had severe damage. It was necessary to replace a lot of floorboards, then to fill all gaps, sanding the upper...
This apartment has a unique design, and the floor has to be in gray. The installation requires perfect fitting because the client doesn't want to see...
The wood flooring of this house was part of the entire renovation. We had to remove the old solid wood floor, and then to make an installation of...