Replacement of bearing beams and new installation - hallway, Chelsea

before and after Replacement of bearing beams, Chelsea

When installing new floors, it's highly important to take care of the subfloor condition and every that has to be replaced. We did the necessary fixations and then installed the new floorboards to achieve maximum effect.

The job took 2 days.

More Sanding Galleries
This house in Kensington & Chelsea had severe damage. It was necessary to replace a lot of floorboards, then to fill all gaps, sanding the upper...
This apartment has a unique design, and the floor has to be in gray. The installation requires perfect fitting because the client doesn't want to see...
The wood flooring of this house was part of the entire renovation. We had to remove the old solid wood floor, and then to make an installation of...
This floor restoration was very easy. The floorboards were in good condition, and they didn't require a lot of work. However, there were some damaged...
This project was seasonal maintenance in a bedroom of a house located in the heart of Mayfair. The maintenance includes light sanding and polishing...
The floor restoration of this house required a lot of work due to hard damage. It was necessary to replace the entire floor, fix sub-floor problems,...