Engineered floorboards installation - house, Barnet

before and after Engineered wood floorboards installation in Barnet

The preparation before flooring installation always takes too much time and this was not an exception. We had to make lots of repairs and fixations. After that we did the fitting of unfinished floorboards, and finsh with matt lacquer. It was a lot of work, but the results are amazing.

The job took 10 hours.

More Sanding Galleries
This hallway had a crying need for a new floor, and we did fitting of engineered wood as it one of the best solutions for such a premise. Of course,...
That's an example of our professional installation of laminate flooring. We prepared the subfloor, add an insulation membrane, and then lay down the...
The flooring restoration very often includes paint removal. We did that during the sanding process, but we had to do that 5 times to achieve the...
Solid wood pine flooring is one of the most popular in London, and its installation is widespread accross apartments and houses. But laying such a...
That's another project for light sanding. This season, many people decided to improve their floor for a long time and invest in their property. It's...
We did floor sanding of the entire house. It includes floor repair of all rooms, the staircases, skirting, and most delicate polishing of the newly...